10-23-2019 05:31 PM
Since there is so much knowledge on this forum, I am back with another question. I have a 2000 34ft (340) Sundancer with twin 7.4 engines. Very tight fit to say the least. Ok, here is the question: I am replacing the battery charger: the wiring for the existing one leads into the Main DC Breaker and Battery Switch Panel. It is located on the bulkhead in the engine room. The front panel has two rows of breakers and a solenoid breakers for port and starboard. I have opened the fuse panel at the helm, with plenty of room to tip it back and gain access. This Main panel, however, is quite large and constructed of plastic. The cover has several screws holding it on. Once removed it will be very awkward trying to place it somewhere. Once I pull the cover off, is there a decent length of wire running to the breakers to move it aside? The breakers have screws on each side and I think leaving them alone is the better side of valor. Last thing I need are the breakers falling in the panel. So, if anyone has tackled opening one of these, please share what you discovered. .
10-23-2019 07:19 PM
10-24-2019 08:01 AM
10-24-2019 08:19 AM
10-24-2019 09:00 AM
10-24-2019 01:54 PM
10-24-2019 02:35 PM
10-24-2019 03:53 PM
10-26-2019 05:22 PM
10-26-2019 07:28 PM
10-27-2019 09:01 AM
10-27-2019 10:28 AM
10-27-2019 12:42 PM
10-27-2019 12:49 PM
10-27-2019 01:21 PM
10-27-2019 04:56 PM
10-27-2019 06:16 PM
10-27-2019 06:46 PM
10-28-2019 08:02 AM
10-28-2019 08:35 AM
10-28-2019 09:50 AM
10-28-2019 10:06 AM
10-28-2019 03:09 PM
10-28-2019 04:13 PM
10-28-2019 08:24 PM
10-29-2019 07:27 AM
11-03-2019 05:31 AM
11-03-2019 05:39 AM